Table 26
Hardware audit
Hardware Audit
Perform the Hardware Audit prior to the scheduled upgrade.
Verify Shipping List - Complete and Accurate
Audit Site for new hardware locations
Pre Run Cables if possible
Review All switch settings for new cards
Read all applicable NTP Procedures completely

Pre-conversion steps

Table 27
Pre-conversion steps (Part 1 of 2)
Pre Conversion Steps
A capture file should be made of the following information using a PC or Printer.
Perform an overall system check:
LD 135 SCPU (ensure that the system is redundant)
LD 137 STAT/TEST CMDU
LD 48 STAT AML
LD 32 STAT
LD 60 STAT
LD 30 LDIS (Verify what Is disabled if any)
Avaya Communication Server 1000E Upgrade
Hardware audit
Appendix B: Upgrade checklists
Yes
Page 209 of 226
No
Hardware Upgrade Procedures

Advertisement

Table of Contents
loading

Table of Contents