Installing the cards

Hardware Upgrade Task Overview
Media Gateway slot locations
Avaya Communication Server 1000E Upgrade
Upgrading a CP PII or CP PIV to CP PM
To install the hardware for a CP PM upgrade, perform the following steps:
1
Power down the CP PII or CP PIV Call Server.
2
Remove any SSC cards as described in Procedure 19 on
3
Install the DSP Daughterboard on the MGC card as described in
Procedure 20 on
4
Install the MGC card as described in Procedure 21 on
5
Install the CP PM as described in Procedure on
6
Cable the cards as shown in "Cabling the cards" on
7
Power up the Media Gateway.
8
Enter the 'mgcsetup' menu and configure the IP parameters, then reboot
the MGC.
If the Centralized Software Upgrade (CSU) feature is enabled on the Call
Server, the firmware for the MGC is downloaded automatically (or if the
internal Compact Flash is blank), otherwise initiate the firmware download
using Overlay 143 commands.
A Media Gateway performs functions under the control of the Avaya
Communication Server 1000E core call server. Traditionally, this core call
server was a CP PII or CP PIV in its own call server cabinet or chassis;
however, the CP PM call server sits in one of the Media Gateway slots.
The CP PM Call Server interfaces with the Media Gateway through the
Gateway Controller using the ELAN interface, and therefore does not require
backplane connectivity (other than power and slot ID).