Table 16
Prepare for upgrade steps (Part 2 of 2)
Procedure Step
Connecting a terminal
Printing site data
Performing a template audit
Backing up the CP PII or CP PIV customer database
Planning
Planning for an upgrade involves the following tasks:
•
Read and understand the current release Product Bulletin.
•
Conduct a site inspection to determine proper power and grounding.
•
Review the site profile to determine proper foot space if adding new
columns or modules.
•
Identify all applications (CallPilot, SCCS, IP, etc.) that are currently
installed on the source platform.
•
Identify and correct outstanding service problems.
•
Verify the site log is updated with current trunking, call routing,
application notes, and site contact information.
•
Review all product bulletins and alerts that impact the site.
•
Download a copy of the customer database media converter tool. This
tool is used to transfer the customer database from floppy disk to CF card
if you are upgrading from a CP PII.
•
Prepare a contingency plan for backing out of the upgrade.
Avaya Communication Server 1000E Upgrade
Upgrading a CP PII or CP PIV to CP PM
DANGER OF ELECTRIC SHOCK
In a DC-powered system, power to the column can
remain on during the following procedures. In an
AC-powered system, however, power to the entire
column must be shut down throughout the procedures.
Page 131 of 226
Hardware Upgrade Procedures
Page
133
133
136
138