Mitsubishi MR-J4-10A Instruction Manual page 601

Melservo j4 servo amplifier
Table of Contents

Advertisement

APPENDIX
App. 4.9 Check list for user documentation
The following items must be satisfied by the initial test operation at least. The manufacturer/installer must
be responsible for checking the standards in the items.
Maintain and keep this checklist with related documents of machines to use this for periodic inspection.
1. Is it based on directive/standard applied to the machine?
2. Is directive/standard contained in Declaration of Conformity (DoC)?
3. Does the protection instrument conform to the category required?
4. Are electric shock protective measures (protection class) effective?
5. Is the STO function checked (test of all the shut-off wiring)?
Checking the items will not be instead of the first test operation or periodic inspection by professional
engineers.
MR-J4 installation checklist for manufacturer/installer
App. - 18
Yes [ ], No [ ]
Yes [ ], No [ ]
Yes [ ], No [ ]
Yes [ ], No [ ]
Yes [ ], No [ ]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents