Panasonic Switch-M8ePWR PN27089KA Operation Manual page 153

Table of Contents

Advertisement

Screen Description
RRP Domain
Displays the domain name.
Name:
Node Type:
Displays the node role.
Master
Transit
Ring Status:
Displays the ring status.
Idle
Complete
Failed
Link-Up
Link-Down
Pre-Forwarding
Primary Port:
Displays the primary port.
Primary Port
Displays the primary port status.
Status:
Unknown
Fowarding
Down
Blocking
Primary Port
Displays the primary port role.
Role:
Upstream
Downstream
Secondory Port:
Displays the secondary port.
Secondory Port
Displays the secondary port status.
Status:
Unknown
Fowarding
Down
Blocking
Secondory Port
Displays the secondary port role.
Role:
Upstream
Downstream
Polling Interval:
Displays the polling interval.
Fail Period:
Displays the timeout for polling.
Ctrl VLAN:
Displays the set control VLAN ID.
Data VLAN:
Displays the set data VLAN ID.
Displays that the Switching Hub is Master node,
controller of the ring topology.
Displays that the Switching Hub is Transit node.
Displays that the RRP Status is disabled.
Displays that a ring topology has been correctly established.
This status is displayed for the Master nodes only.
Displays that a ring topology has not been established.
This status is displayed for the Master nodes only.
Displays that the primary and secondary ports are linked
correctly.
This status is displayed for the Transit nodes only.
Displays that the primary and/or secondary ports are
down.
This status is displayed for the Transit nodes only.
Displays that a ring topology is being established.
This status is displayed for the Transit nodes only.
Displays that the domain is invalid.
Displays normal communication status.
Displays that the port does not link up.
Displays that no frames other than control frames are
not received.
Operating as an upstream port.
Operating as a downstream port.
Displays that the domain is invalid.
Displays normal communication status.
Displays that the port does not link up.
Displays that no frames other than control frames are
not received.
Operating as an upstream port.
Operating as a downstream port.
153

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switch-m8espwr pn27089na

Table of Contents