Shipping Inventory
Inspect the shipping cartons for evidence of physical damage. If a shipping carton
appears damaged, request that the carrier's agent be present when the carton is
opened. Keep all contents and packing material for the agent's inspection.
The ship kit for the Sun Server X4-2 includes the following items:
Power cords, packaged separately with country kit
■
Rackmount kit containing rack rails and installation instructions
■
Miscellaneous hardware, cables, and connectors
■
Sun Server X4-2 Getting Started Guide
■
Legal and safety documents
■
Related Information
"Optional Component Installation" on page 18
■
Tools and Equipment Needed for
Installation
To install the system, you must have the following tools:
No. 2 Phillips screwdriver
■
ESD mat and grounding strap
■
In addition, you must provide a system console device, such as one of the following:
ASCII terminal
■
Workstation
■
Terminal server
■
Patch panel connected to a terminal server
■
Related Information
"Installing the Server Into a Rack" on page 39
■