Engine Installation - Suzuki GW250 Service Manual

Table of Contents

Advertisement

3-8 ENGINE
• Remove the engine mounting bolts and nuts.
• Gradually lower the engine.
• Remove the engine assembly.

ENGINE INSTALLATION

Install the engine in the reverse order of engine removal.
Pay attention to the following points:
NOTE:
The engine mounting nuts and frame down tube nuts are
self-locking. Once the nuts have been removed, they are no
longer of any use.
• Insert the two engine mounting bolts from left side, and
tighten their nuts.
• Install the frame down tube 1 and engine mounting brackets
2.
• Tighten the bolts and nuts to the specified torque.
 Frame down tube nut A: 50 N·m (5.0 kgf-m, 36.0 lbf-ft)
Engine mounting bracket nut B:
• Tighten the engine mounting bolts and nuts to the specified
torque.
 Engine mounting nut C: 55 N·m (5.5 kgf-m, 40.0 lbf-ft)
60 N·m (6.0 kgf-m, 43.5 lbf-ft)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw250l3

Table of Contents