Installation - Suzuki GW250 Service Manual

Table of Contents

Advertisement

8-30 CHASSIS

INSTALLATION

Install the handlebars in the reverse order of removal. Pay atten-
tion to the following points:
• Insert the boss A of the handlebar holder into the hole B of
the upper bracket.
• Tighten the handlebar holder bolts 1 to the specified torque.
 Handlebar holder bolt: 23 N·m (2.3 kgf-m, 16.5 lbf-ft)
• Insert the throttle grip 2 onto the right handlebar.
• Insert the clutch lever holder 3 onto the left handlebar.
• Align the depression C of the handlebar with the hole D of
the handlebar holder.
• Tighten the handlebar clamp bolts 4 to the specified torque.
(10-35)
 Handlebar clamp bolt: 16 N·m (1.6 kgf-m, 11.5 lbf-ft)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw250l3

Table of Contents