Suzuki GW250 Service Manual page 315

Table of Contents

Advertisement

• Install the front brake master cylinder. (8-62)
• Insert the projection E of the right handlebar switch box into
hole of the right handlebar.
• Apply grease to the throttle cables and cable pulley.
 99000-25010: SUZUKI SUPER GREASE "A"
• Align the clutch lever holder's mating surface F with the
punch mark G on the left handlebars.
• Tighten the clutch lever holder bolt 5 to the specified torque.
 Clutch lever holder bolt: 10 N·m (1.0 kgf-m, 7.0 lbf-ft)
• Apply a handle grip bond onto the left handlebar before
installing the handlebar grip.
HANDLE GRIP BOND (Commercially available)
• Insert the projection H of the left handlebar switch box into
the hole of the left handlebar.
After installing the handlebars, the following adjustments are
required before riding.
• Cable routing (10-17)
• Throttle cable play (2-13)
• Clutch lever play (2-14)
or equivalent
CHASSIS 8-31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw250l3

Table of Contents