Suzuki GW250 Service Manual page 129

Table of Contents

Advertisement

• Engage the oil pump drive chain 5 to the oil pump drive
sprocket 6 and oil pump driven sprocket 7.
• Install the oil pump drive chain 5 with the oil pump drive
sprocket 6 and oil pump driven sprocket 7.
NOTE:
Teeth C on the oil pump drive sprocket 6 must face the clutch
side.
• Install the washer 8 and new snap ring 9.
 09900-06107: Snap ring pliers (Open type)
NOTE:
Be careful not to drop any parts into the crankcase.
CLUTCH
ENGINE 3-81
Primary driven gear
1
assembly
2 Clutch sleeve hub
3 Spring washer seat
4 Spring washer
5 Clutch drive No.3 plate
6 Clutch driven plate
7 Clutch drive No.2 plate
8 Clutch drive No.1 plate
9 Clutch push piece
0 Clutch pressure plate
A Clutch push rod
A Clutch sleeve hub nut
ITEM N·m kgf-m lbf-ft
A
50
5.0
36.0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw250l3

Table of Contents