2. Preparation for Installation
Figure 2-10 Terminal board of the DC power supply unit
(1) Cable clamp
(2) 0V terminal (screw: M6)
(3) −48V terminal (screw: M6)
(4) Ground terminal (screw: M6)
(2) Distribution board
Use circuit breakers on the branch circuit supplying power to the Switch. See the
following table for the rated breaker capacity and the required quantity.
Table 2-11 Rated breaker capacity and required quantity
Rated breaker capacity
NOTE
NOTE
(3) Requirements for the incoming current to the distribution board
The capacity of the incoming current to the distribution board must be greater than
that of the breaker operating current described in the above (2) Distribution board.
62
Power supply redundancy
60 A
For easy operation, the distribution board should be installed in the
same room as the Switch or in an adjacent room.
For a redundant power supply, the power from different power supply
systems can be supplied to each power supply unit.
Ensure that the capacity for incoming current to the distribution board
is greater than the operating current of the circuit breaker. If it is not,
the circuit breaker might not operate properly in the event of a failure,
which could result in fire.
None
Required
Required number
1
2