2. Preparation for Installation

2.1 Preparation workflow

The workflow to prepare for installation is shown in Figure 2-1 Flowchart of
preparation for installation.
Be sure to schedule enough time to complete the following work before installing
the Switch: power supply work, communications equipment work, and laying down
LAN cables.
Figure 2-1 Flowchart of preparation for installation