Alaxala AX6300S Series Instruction Manual page 190

Multilayer switches
Hide thumbs Also See for AX6300S Series:
Table of Contents

Advertisement

5. Adding and Replacing Optional Modules
Figure 5-24 Installing a management and switching unit (1)
(1) Management and switching unit
(2) Management and switching unit slot
Step 2
While holding the levers, push the unit carefully until the levers touch the Switch.
The levers must be opened parallel to the direction of insertion.
Figure 5-25 Installing a management and switching unit (2)
(1) Contact point
(2) Lever
CAUTION
CAUTION
166
While holding the levers, push the management and switching unit
carefully until the levers touch the Switch.
Failure to do this could result in a Switch malfunction or fault.
When you install a management and switching unit, open the levers as
shown in the figure. If the levers are closed or opened too much, they
might be damaged when you install the unit.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ax63s-h001-50xAx6304sAx6308s

Table of Contents