2.
Preparation for Installation
This chapter describes the environment conditions and preparations required for
installation of the Switch. Before preparing for the installation, read this chapter
carefully and be sure that you understand all instructions and notes within.
2.1 Preparation workflow
2.2 Installation conditions
2.3 Carrying a Switch
2.4 Power supply facility
2.5 Notes on electric noise
2.6 Leakage current
2.7 Environment conditions
2.8 Installation location
2.9 Maintenance area
2.10 Cooling requirements
2.11 Device noise
51