Concluding Steps - Fujitsu PRIMERGY RX300 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S8:
Table of Contents

Advertisement

Processors
Figure 146: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
Ê If applicable, install the second processor accordingly.

11.2.3 Concluding steps

"Installing processor heat sinks" on page 286
Ê
"Reassembling" on page 63
Ê
"Connecting the server to the power source" on page 69
Ê
"Updating or recovering the system board BIOS and iRMC" on page 80
Ê
"Switching on the server" on page 71
Ê
"Enabling SVOM boot watchdog functionality" on page 89
Ê
"Enabling BitLocker functionality" on page 95
Ê
272
Upgrade and Maintenance Manual
RX300 S8

Advertisement

Table of Contents
loading

Table of Contents