Configuration 2 To Configuration 7 - Fujitsu PRIMERGY RX300 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S8:
Table of Contents

Advertisement

Ê Insert the HDD cage.
Ê Remove cable C10 from the connector MLC1 of the 4x 2.5-inch SAS
backplane (1).
Figure 302: Connecting SAS cables
Ê Connect cable C10 to the connector MLC2 of the SAS controller (1).
Ê Connect the cable C9 to X1 of the 4x 2.5-inch SAS backplane (2) and the
MLC1 of the SAS controller (3).
Ê Route the cables as shown.

15.3.2 Configuration 2 to configuration 7

I
The configuration 2 must include a SAS controller. Otherwise you must
install a SAS controller as described in section
controller" on page
RX300 S8
190.
Upgrade and Maintenance Manual
Conversion configurations
"Installing the SAS RAID
451

Advertisement

Table of Contents
loading

Table of Contents