Concluding Steps - Fujitsu PRIMERGY RX300 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S8:
Table of Contents

Advertisement

Expansion cards and backup units
Figure 98: Connecting cable
Ê Connect the loose end of the NCSI sideband cable to the system board:
Connector
NC-SI
9.5.2.5

Concluding steps

"Reassembling" on page 63
Ê
"Connecting the server to the power source" on page
Ê
"Switching on the server" on page
Ê
Ê In order to configure an expansion card that has been installed or replaced,
the card's Option ROM has to be enabled in the system board BIOS. If
applicable, proceed as described in section
page
85.
"Enabling SVOM boot watchdog functionality" on page
Ê
"Enabling BitLocker functionality" on page
Ê
Ê If applicable,
"After replacing / upgrading LAN controllers" on page
202
Cable
NCSI sideband cable T26139-Y4015-V101
71.
Upgrade and Maintenance Manual
69.
"Enabling Option ROM scan" on
89.
95.
99.
RX300 S8

Advertisement

Table of Contents
loading

Table of Contents