Tools You Need At Hand - Fujitsu PRIMERGY RX300 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S8:
Table of Contents

Advertisement

Before you start
Step
Server shutdown
Rack removal,
disassembly
Transport
Maintenance
procedures
Transport
Assembly,
rack installation
Starting up
Table 1: Calculation of the average task duration
2.3

Tools you need at hand

When preparing the maintenance task, ensure that all required tools are
available according to the overview below. You will find a list of required tools at
the beginning of each procedure.
32
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on
page
Making the server available, removing the
yes
server from the rack (if applicable)
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks
Returning the server to its installation site
no
(where required) depends on local
customer conditions.
Reassembling the server, installing the
yes
server in the rack (if applicable)
Booting time depends on hardware and
no
software configuration and may vary
significantly.
Upgrade and Maintenance Manual
73".
RX300 S8

Advertisement

Table of Contents
loading

Table of Contents