NETGEAR ProSafe GSM5212P Software Administration Manual page 384

Managed switch 9.0.2
Hide thumbs Also See for ProSafe GSM5212P:
Table of Contents

Advertisement

Configure
Switch GSM7328S_2
(Netgear Switch) #show interfacet tunnel 0
Interface Link Status.......................... Up
IPv6 is enabled
IPv6 Prefix is ................................ FE80::C0A8:101/128
MTU size....................................... 1280 bytes
#show interface tunnel
TunnelId
Interface
--------
---------
0
tunnel 0
(Netgear Switch) # ping ipv6 2000::2
Send count=3, Receive count=3 from 2000::2
Average round trip time = 1.00 ms
(Netgear Switch) #config
(Netgear Switch) (Config)#ip routing
(Netgear Switch) (Config)#ipv6 forwarding
(Netgear Switch) (Config)#ipv6 unicast-routing
(Netgear Switch) (Config)#interface 1/0/13
(Netgear Switch) (Interface 1/0/13)#routing
(Netgear Switch) (Interface 1/0/13)#ip address 192.168.1.2 255.255.255.0
(Netgear Switch) (Interface 1/0/13)#exit
(Netgear Switch) (Config)#interface tunnel 0
(Netgear Switch) (Interface tunnel 0)#ipv6 enable
(Netgear Switch) (Interface tunnel 0)#ipv6 address 2000::2/64
(Netgear Switch) (Interface tunnel 0)#tunnel mode ipv6ip
(Netgear Switch) (Interface tunnel 0)#tunnel source 192.168.1.2
(Netgear Switch) (Interface tunnel 0)#tunnel destination 192.168.1.1
(Netgear Switch) (Interface tunnel 0)#exit
(Netgear Switch) (Config)#exit
(Netgear Switch) #show interface tunnel
TunnelId
Interface
--------
---------
0 tunnel
0
384 |
Chapter 26. Tunnel
TunnelMode
SourceAddress
----------
-------------
6 in 4 Configured
192.168.1.1
TunnelMode
SourceAddress
----------
-------------
6 in 4 Configured
192.168.1.2
ProSafe Managed Switch
2000::1/64
DestinationAddress
------------------
192.168.1.2
DestinationAddress
------------------
192.168.1.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prosafe gsm7212fProsafe gsm7212pProsafe gsm7224p

Table of Contents