Komatsu D61EXi-24 Operation & Maintenance Manual page 158

Bulldozer
Hide thumbs Also See for D61EXi-24:
Table of Contents

Advertisement

TOOLS MENU
8.
Select the device of Recipients, and press "Next".
REMARK
Put a tick in the check box of "Show offline clients", and the
devices currently in offline are also displayed.
9.
Select if you import the exported data to the active Surface
at Recipients of data, and press "Next".
(1) "Import into recipients current active project"
Exported data to the active Project at Recipients is import-
ed.
(2) "Overwrite surface w. same name"
The Surface with the same name is overwritten.
(3) "Replace all lines in layer w. same name"
All lines in the Layer with the same name are replaced.
(4) "Replace all points in layer w. same name"
All points in the Layer with the same name are replaced.
On "Summary" screen, the Summary of Export Data set-
ting is displayed.
10. Press "Finish".
The data exporting starts.
During the data exporting, "Sitelink3D messaging" mark on the
main window becomes red.
4-64
HANDLE CONTROL BOX

Advertisement

Table of Contents
loading

This manual is also suitable for:

D61pxi-24

Table of Contents