File Menu; Project Files; Machine Setting; Method For Importing And Setting Project Files - Komatsu D61EXi-24 Operation & Maintenance Manual

Bulldozer
Hide thumbs Also See for D61EXi-24:
Table of Contents

Advertisement

HANDLE CONTROL BOX

FILE MENU

Before starting of work, it is necessary to prepare the project file, control point file, surface files, machine setting
file, etc. which are required for accurate leveling of the jobsite.
On "File" menu, you can input, output, and set the project file, control point file, layers, point data file, surface
files, and work data which are used for 3DMC.

PROJECT FILES

Project file (*.tp3) is a jobsite file which contains the files of all types such as the control point file, layer, point
data file, surface file, etc. which are handled by 3DMC.
The project file is used together with 3D-Office or Pocket-3D made by TOPCON CORPORATION. Also, you can
use the same setting in common by importing this file into the internal memory of the control box of another
construction machine.

METHOD FOR IMPORTING AND SETTING PROJECT FILES

When importing a project file from USB memory to internal memory of the control box and setting it as a current
work, perform the following procedure.
If the following files are contained in the project files, those files are also imported.
Control point file (*.gc3)
3D surface files
Alignment file (*.rd3)
TIN data file (*.tn3)
Plane surface file (*.pl3)
Linework data file (*.In3)
Point data file (*.pt3)
1.
Hold down the power ON/OFF and menu switch (1) to turn
on the control box power.
2.
Insert USB memory (2) in which project files are saved into
USB port (3) of the control box.
3.
Press the power ON/OFF and menu switch (1) to display
the main menu.
4.
On "File" menu, press "Projects..." and select.
FILE MENU
4-13