Replacement Of The Opio Hub To Lower Keyboard Pwa Power Cable - GE LOGIQ Totus Basic Service Manual

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-5-5

Replacement of the OPIO HUB To Lower Keyboard PWA Power Cable

This table includes information specific to these instructions. For more information
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page
Table 8-23
Manpower
One person
8-5-5-1
Preparations
1.) Power off/Shutdown the system as described in
2.) Remove the OPIO Top Cover Set-T as described in
Set-T" on page 8-89
3.) Remove the UOPIO-T Assy as described in
8-98
8-5-5-2
Removal Procedure
1.
Push the button of the OPIO HUB To Lower Keyboard
PWA Power Cable's connector and then disconnect
the connector.
8-5-5-3
Installation Procedure
1.) Parts to be installed in reverse order of removal
2.) Perform "Functional Checks after FRU replacement (Debrief Guideline)" as described in
12 on page 8-223
GE HealthCare CONFIDENTIAL
. 1
Manpower, Time, Tools, and PPE
Time
Approximately 15 minutes
Steps
Section 8-5 - Replacing Cables
LOGIQ T
Tools
Phillips screwdriver
1-7-2 "Lockout/tagout procedure" on page 1-25
8-7-2 "Replacement of the OPIO Top Cover
8-7-10 "Replacement of the UOPIO-T Assy" on page
Corresponding Graphic
Basic Service Manual
OTUS
8-2-6 "Tools needed
8-6.
PPE
Cut resistant gloves
Knee Pad
Section 8-
8 - 47

Advertisement

Table of Contents
loading

Table of Contents