GE LOGIQ Totus Basic Service Manual page 559

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-12-66
Replacement of the UMC-T
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-1 "Control panel adjustment and functional
checks"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-23 "4D option functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
8-12-67
Replacement of the BATTERY, TYPE 2032 COIN, 3 VOLT, LITHIUM
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
8-12-68
Replacement of the UAC-T PWA
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional
checks"
4-3-1 "Control panel adjustment and functional
checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
GE HealthCare CONFIDENTIAL
. 1
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief Script
checks and is ready for use.
LOGIQ T
Basic Service Manual
OTUS
8 - 233

Advertisement

Table of Contents
loading

Table of Contents