GE LOGIQ Totus Basic Service Manual page 500

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-10-4 Replacement of the COM EXPRESS MODULE, I5 CFL 16G
This table includes information specific to these instructions. For more information
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page
NOTE:
If you are replacing the SSD drive as FRU, the new SSD drive does not come loaded with
software, therefore a full software load is needed. See
Upgrading the Software" on page
Table 8-93
Manpower
One person
8-10-4-1
Preparations
1.) Power off/Shutdown the system as described in
2.) Remove the Rear Cover Mid Assy-T as described in
Assy-T" on page 8-138
3.) Remove the Rear Cover Top Assy-U as described in
Assy-U" on page 8-143
4.) Remove the T2 Side Cover L Assy as described in
Assy" on page 8-135
8 - 174
GE HealthCare CONFIDENTIAL
. 1
Manpower, Time, Tools, and PPE
Time
Approximately 15 minutes
Section 8-10 - Replacing Back End Parts
Section 8-4 "Loading / Reloading /
8-8.
Tools
Phillips screwdriver
1-7-2 "Lockout/tagout procedure" on page 1-25
8-8-10 "Replacement of the Rear Cover Mid
8-8-15 "Replacement of the Rear Cover Top
8-8-7 "Replacement of the T2 Side Cover L
LOGIQ T
Basic Service Manual
OTUS
8-2-6 "Tools needed
PPE
Cut resistant gloves
Knee Pad
8-6.

Advertisement

Table of Contents
loading

Table of Contents