Installation Procedure
1.) Parts to be installed in reverse order of removal
2.) Perform "Functional Checks after FRU replacement (Debrief Guideline)" as described in
12 on page 8-223
NOTE:
Fix UBE To OPIO HUB D-SUB 15PIN Cable Tie as below figure
- Align the marks on UBE To OPIO HUB USB3.0 Cable(2EA) and UBE To OPIO HUB D-SUB 15Pin
Cable and fix the cables using Cable Tie, DACT-100A
-Align the marks on UBE To OPIO Touch Panel HDMI Cable, GND Cable (Chassis To OPIO) and UBE
To Monitor HDMI Cable and fix the cables using Cable Tie, DACT-100A.
-Align the marks on cables and fix the cables using Cable Clamp CPFDM14-A.
NOTE:
The UBE To OPIO HUB USB 3.0 Cable can be inserted to any of two USB ports (OPIO HUB).
8 - 66
GE HealthCare CONFIDENTIAL
. 1
Section 8-5 - Replacing Cables
LOGIQ T
Basic Service Manual
OTUS
Section 8-

Advertisement

Table of Contents
loading

Table of Contents