GE LOGIQ Totus Basic Service Manual page 369

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-5-3-1
Installation
Install components in reverse order of removal.
8-5-3-2
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-5-3-3
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws and covers removed earlier have been installed.
2.) Connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-5-3-4
Functional checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
Leakage current is NOT required since no electronic part is being replaced. Ground continuity, however,
is recommended.
Table 8-21 Cable replacement Functional Checks
Section
4-2-3
4-3-7
10-6-4
4-2-4
GE HealthCare CONFIDENTIAL
. 1
Functional Check
Power ON/Boot Up
Probe/connector functional checks
Grounding Continuity
Power shut down
Section 8-5 - Replacing Cables
LOGIQ T
OTUS
Debrief Script
Leakage Current measured at (record the value) and
meets allowable limits. Equipment passed all required
checks and is ready for use.
Basic Service Manual
8 - 43

Advertisement

Table of Contents
loading

Table of Contents