GE LOGIQ Totus Basic Service Manual page 561

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-12-72
Replacement of the Touch Panel MIC Set-U
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"
8-12-73
Replacement of the Speaker Set-U
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"
8-12-74
Replacement of the External USB Set-U
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-20 "Basic measurement functional checks"
4-2-4 "Power shut down"
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
GE HealthCare CONFIDENTIAL
. 1
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief
Script
Equipment passed all required checks and is ready for
use.
LOGIQ T
Basic Service Manual
OTUS
8 - 235

Advertisement

Table of Contents
loading

Table of Contents