GE LOGIQ Totus Basic Service Manual page 565

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-12-85
Replacement of the BW printer Option Cable Set-U
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-8 "B-Mode functional checks"
Print by BW Printer
4-2-4 "Power shut down"
8-12-86
Replacement of the ACDC Link Cable To UBE Cable
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-8 "B-Mode functional checks"
4-3-20 "Basic measurement functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
8-12-87
Replacement of the Battery Option Cable Set-U
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-7 "Probe/connector functional checks"
4-3-25 "Battery Pack functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
8-12-88
Replacement of the U-DCWD Set
Functional Check
4-2-3 "Power ON/Boot Up"
4-3-7 "Probe/connector functional checks"
4-3-8 "B-Mode functional checks"
4-3-10 "System CFM and PWD functional checks"
4-3-14 "PW/CW Doppler mode functional checks"
4-3-15 "CW Doppler mode functional checks"
10-6-4 "Grounding Continuity"
10-6-6 "Earth Leakage Current Test"
4-2-4 "Power shut down"
Section 8-12 - Functional Checks after FRU replacement (Debrief Guideline)
GE HealthCare CONFIDENTIAL
. 1
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief
Script
Equipment passed all required checks and is ready for
use.
Debrief
Script
Equipment passed all required checks and is ready for
use.
LOGIQ T
Basic Service Manual
OTUS
8 - 239

Advertisement

Table of Contents
loading

Table of Contents