GE LOGIQ Totus Basic Service Manual page 339

Table of Contents

Advertisement

D
5936427, R
IRECTION
EV
8-4-7
Loading the base image and application software - full load (continued)
Table 8-6
1.
Remove any USB flash drives and any CD/DVDs from
the DVD drive prior to updating the software.
Disconnect the system from the network and remove all
transducers from the system.
If used, disconnect the secondary monitor, any HDMI or
DisplayPort cables and/or external monitors.
Power down the LOGIQ Totus.
Insert the software thumb drive into the USB port on the
back of the LOGIQ Totus.
Power on the LOGIQ Totus.
2
CAUTION
Selecting 1- (FULL) is a DATA WIPE & System Application reload. ALL EXISTING PATIENT DATA WILL BE
REMOVED. All existing data will be removed. System and application installation will be completed without
preserving customer data.
With the trackball, point to 1 - (FULL) and then press the
left set key to select
1 - (FULL).
With the trackball, point to OK and press the left set key
to select OK.
In the Warning dialog box, select Yes.
This will take approximately 10-15 minutes.
GE HealthCare CONFIDENTIAL
. 1
Load Base Image and Application Software- full load
Step
Section 8-4 - Loading / Reloading / Upgrading the Software
LOGIQ T
Basic Service Manual
OTUS
Corresponding Graphic
8 - 13

Advertisement

Table of Contents
loading

Table of Contents