Installation position

When installing the NZ2GN-GFB in a control panel, provide a clearance of 60mm or more (1) between the module and the
sides of the control panel or other parts to ensure good ventilation and facilitate module change. (For the front direction,
provide a clearance of 60mm or more (2).)
When installing two or more NZ2GN-GFB and CC-Link IE TSN remote modules next to each other, they can be installed in
contact with each other.
• Vertical direction and horizontal direction
(1)
(1)
(1)
(1)
• Front direction
(2)
5.2 Installation Environment and Installation Position
5 INSTALLATION AND WIRING
5
31