Chapter 3 Procedures Before Operation - Mitsubishi Electric CC-Link IE TSN User Manual

Field network bridge module
Table of Contents

Advertisement

3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Setting switches
Set the following switches.
Page 26 Settings for CC-Link IE TSN IP address setting switch
Page 28 Settings for CC-Link IE Field Network station number setting switch
Page 29 Function setting switch setting
2.
Mounting the module
Mount the NZ2GN-GFB on a DIN rail.
Page 33 Installation
3.
Wiring
Connect the power supply and Ethernet cables to the NZ2GN-GFB.
Page 35 Wiring of Terminal Block for Module Power Supply and FG
Page 39 Wiring of Ethernet Cable
4.
Parameter settings
Set each parameter.
Item
When the NZ2GN-GFB is used as
the CC-Link IE Field Network master
station
When the NZ2GN-GFB is used as
the CC-Link IE Field Network local
station
5.
Programming
Create a program.
Page 101 Program Examples
To replace the module, follow the procedure described below:
• When the parameters are set by the engineering tool, export the parameters.
• Power off the NZ2GN-GFB and remove it.
• Prepare a new NZ2GN-GFB and perform step 1 to step 4. At this time, the settings on each switch must be
the same as the settings for the NZ2GN-GFB before replacement.
• When the parameters are set by the engineering tool, import the parameters.
• Check that the RUN LED and D LINK LED of the NZ2GN-GFB are on and the ERR. LED is off before
restarting control operation.
3 PROCEDURES BEFORE OPERATION
20
Parameter to be set
CC-Link IE TSN parameter settings
Module parameter setting
Parameter settings for CC-Link IE Field Network device
station
CC-Link IE TSN parameter settings
Parameter settings for CC-Link IE Field Network
Module parameter setting
Reference
Page 42 Parameter Settings for CC-Link IE TSN
Page 47 Module Parameter Setting
Page 66 Parameter Settings for CC-Link IE Field
Network Device Station
Page 42 Parameter Settings for CC-Link IE TSN
Page 45 Parameter Settings for CC-Link IE Field
Network
Page 47 Module Parameter Setting