4.
Set the refresh settings as follows.
[Navigation window] [Parameter] [Module Information] [RJ71GN11-T2] [Basic Settings] [Refresh Settings]
[Detailed Setting]
5.
Display the CC-Link IE TSN configuration window and add the NZ2GN-GFB.
[Navigation window] [Parameter] [Module Information] [RJ71GN11-T2] [Basic Settings] [Network
Configuration Settings] [Detailed Setting]
6.
Set "Station-specific mode setting" to "Master Station".
7.
Set the following parameters for the NZ2GN-GFB.
Setting item
RX Setting
RY Setting
RWr Setting
RWw Setting
8.
Click the [Close with Reflecting the Setting] button to close the "CC-Link IE TSN Configuration" window.
9.
Click the [Apply] button.
10.
Write the set parameters to the CPU module on the CC-Link IE TSN master station. Then, reset the CPU module or
power off and on the system.
[Online] [Write to PLC]
Points
Start
End
Points
Start
End
Description
48
0000
002F
64
0000
003F
8 PROGRAMMING
103
8.2 Program Examples
8