Mitsubishi Electric CC-Link IE TSN User Manual page 39

Field network bridge module
Table of Contents

Advertisement

Connecting and disconnecting the cable
To connect the cable, push in the open/close button with a flathead screwdriver, insert the wire into the wire insertion opening,
and remove the flathead screwdriver.
When using a bar solderless terminal, insert a wire with the bar solderless terminal into the wire insertion opening and push
the wire.
After inserting the wire, pull the wire or its bar solderless terminal lightly to check that the wire is securely clamped.
■Connecting the wire
(1)
(2)
(1) Test terminal
(2) Open/close button
(3) Wire insertion opening
Continuity can be checked with test terminal.
Use the following test plug to check continuity.
• PHOENIX CONTACT GmbH & Co. KG test plug (1.0mm): MPS-MT 1-S4-B RD, MPS-MT 1-S
To disconnect the cable, push in the open/close button with a flathead screwdriver. With the button pushed in, pull out the wire
or bar solderless terminal.
(3)
■Connecting the wire with a bar solderless terminal
5 INSTALLATION AND WIRING
5.4 Wiring of Terminal Block for Module Power Supply and FG
5
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cc-link ie

Table of Contents