Installation Procedure; Installation Prerequisites - Oracle Exadata X10M Service Manual

Table of Contents

Advertisement

Table C-4
Specifications
Requirement
Height
Width (with side panels)
Depth Model 1242
Depth Model 1042
Weight Model 1242
Weight Model 1042
Maximum dynamic load
Note:
Depth is measured from front door handle to back door handle.

Installation Procedure

This topic provides an overview of the Exadata Server X10M installation procedure. Review
the entire installation procedure and find links to more information about each step.
The following list summarizes the tasks that you must perform to properly install Exadata
Server X10M.
Review Known Issues for any late-breaking information about the server. Refer to Oracle
1.
AMD-Based Cloud Servers Product Notes.
Confirm Installation Prerequisites. Prepare to install the server.
2.
Install the server into a rack.
3.
Rackmount the
rack, and install the mounting brackets and slide rails. Install the server hardware.
Connect to the system. Attach cables and power cords to the server.
4.
Power on the server.
5.
Connect to Oracle Integrated Lights Out Manager (ILOM).
6.
Install the operating system.
7.

Installation Prerequisites

Prepare to install the server. Before you start the Rackmount Procedures or
Server Into the
Review the server:
1.
Features
Components
(Cont.) Sun Rack II Model 1242 and Sun Rack II Model 1042 Rack
Specification
199.8 cm (78.66 inches)
60 cm (23.62 inches)
120 cm (47.24 inches)
105.8 cm (41.66 inches)
150.6 kg (332 lbs)
123.4 kg (272 lbs)
1005 kg (2215 lbs)
server. To rackmount the server, secure the rack to the floor, stabilize the
Rack, ensure that the following tasks are complete.
Appendix C
Installation Procedure
Reinstall the
C-3

Advertisement

Table of Contents
loading

Table of Contents