Saturn DigiSizer II 5205
e. Select Stirrer Speed Fast.
f. Select Stirrer Off.
g. Select Move Arm Up.
h. Select Move To Beaker and enter the beaker position; note that the display is updated
to reflect the position of the beaker tray. The picture on the screen will reflect whether
or not a beaker is present.
12. Place the MasterTech pump switch on the front panel in the AUTO position, then select
the MasterTech pump on the schematic. In each instruction in this step, first access the
pop-up menu:
a. Select On; the MasterTech pump should begin operating (you will hear a whirring
sound and the pump will begin to operate).
b. Check the direction of the flow of the MasterTech pump:
Select Flow Direction Load; allows suspension to flow from the MasterTech to the
Saturn DigiSizer system for analysis.
Select Flow Direction Rinse; allows suspension to move from the Saturn DigiSizer
system to the MasterTech. This direction is used to rinse the sample from the stirrer and
transfer tube on the MasterTech.
c. Select Off to turn the pump off.
13. Rinse and prime the tubing of the MasterTech:
a. Place an empty beaker in position 2 of the MasterTech tray.
b. Select Unit [n] > Rinse > MasterTech Rinse then DigiSizer.
c. Specify 2 as the beaker position, then click
This concludes verification of operation of the MasterTech. If everything performed as
described above, the system should be fully operational. If you encountered any problems,
refer to Chapter 9 of the Saturn DigiSizer 5205 Operator's Manual for troubleshooting
procedures.
Jul 09
MasterTech
Pump
Beaker Position
OK
.
Verifying Operation
79
Need help?
Do you have a question about the Saturn II 5205 DigiSizer and is the answer not in the manual?