Verifying Operation
8. Select Show instrument schematic, then Enable manual control from the Unit menu.
Circulating Pump
9. Right-click on the circulating pump; choose Set speed. Enter 1500 if you have the
standard liquid sampler installed, or 4000 if you have the Low-volume liquid sampler
installed, then click
10. Right-click again and turn on the circulating pump while observing the sample cell.
• If leaks occur, turn off the pump and open the drain valve immediately. Dry the sample
cell area, correct the problem, and repeat the steps again.
• If leaks do not occur after approximately 10-15 seconds, turn off the pump and open the
drain valve to drain the liquid from the system.
11. Turn the pump back on for 3 to 5 seconds to expel any additional liquid that may have
remained in the pump, then turn it off.
12. Close the drain valve.
68
OK
.
Saturn DigiSizer II 5205
MasterTech portion of
schematic
(shown only if a
MasterTech is installed)
Jul 09
Need help?
Do you have a question about the Saturn II 5205 DigiSizer and is the answer not in the manual?