Saturn DigiSizer II 5205
Checking the Pumps and Valve
While performing the steps below, observe the symbols in the instrument schematic. A
component's symbol will change when the state of the component changes.
1. With the instrument schematic displayed, select Unit[n] > Enable manual control.
Circulating pump
2. Check the Analysis liquid pump:
a. Right-click on the Analysis liquid pump symbol, then select High.
b. Right-click on the Analysis liquid pump symbol, then select Low.
c. Right-click on the Analysis liquid pump symbol, then select Off.
3. Check the Rinse pump:
a. Right-click on the Rinse pump symbol, then select On.
b. Right-click on the Rinse pump symbol, then select Off.
4. Check the Circulating pump:
a. Right-click on the Circulating pump symbol, then select On.
b. Right-click on the Circulating pump symbol, then select Off.
c. Right-click on the Circulating pump symbol, then select Set speed.
d. The Pump Speed Setting dialog is displayed. This dialog shows the current setting in
RPMs. If it necessary to specify a different speed, enter the speed in the Pump speed
field.
Jul 09
Rinse Pump
Analysis Pump
Waste valve
Verifying Operation
73
Need help?
Do you have a question about the Saturn II 5205 DigiSizer and is the answer not in the manual?