Ultrasonic Probe - Micromeritics Saturn II 5205 DigiSizer Installation Instructions And Checklist

Table of Contents

Advertisement

Verifying Operation

Ultrasonic Probe

1. With manual control enabled, right-click the Ultrasonic Probe symbol on the instrument
schematic screen, then select Probe on.
Ultrasonic
Probe
2. Right-click the Ultrasonic Probe symbol, then select Probe off.
3. Right-click on the Ultrasonic Probe symbol, then select Set probe intensity.
4. The Ultrasonic Intensity Setting dialog is displayed.
a. Enter 40 in the Ultrasonic Intensity field, then repeat steps 1-3.
b. Enter 60 in the Ultrasonic Intensity field, then repeat steps 1-3.
c. Enter 80 in the Ultrasonic Intensity field, then repeat steps 1-3.
d. Enter 100 in the Ultrasonic Intensity field, then repeat steps 1-3.
5. Check the Waste valve:
a. Right-click on the Waste valve displayed in the instrument schematic, then select Open.
b. Right-click on the Waste valve displayed in the instrument schematic, then select Close.
74
Saturn DigiSizer II 5205
Jul 09

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Saturn II 5205 DigiSizer and is the answer not in the manual?

Questions and answers

Table of Contents