Installing Pwr600 Ac Power Supplies - Allied Telesis x950-52XTQm Installation Manual

Standalone switches, advanced layer 3+ alliedware plus
Table of Contents

Advertisement

Chapter 4: Installing Power Supplies and Optional XEM2 Line Card

Installing PWR600 AC Power Supplies

88
This section contains the procedure for installing PWR600 AC Power
Supplies in the switch. For background information, refer to "PWR600 AC
and DC Power Supplies" on page 36. For a list of power supply
components, refer to "Unpacking the PWR600 AC Power Supply" on
page 83.
Warning
The device is heavy. Use both hands to lift it. You might injure
yourself or damage the device if you drop it. E94
Caution
The electronic components on the device can be damaged by
electrostatic discharge (ESD). Follow the procedure in "Protecting
Against Electrostatic Discharge (ESD)" to guard against ESD
damage when unpacking or installing the device.  E106
To install a power supply, perform the following procedure:
1. Choose a slot for the power supply. The two power supply slots are
labeled PSU A and PSU B on the left side of the rear panel.
If you are installing only one power supply, you can install it in either
slot. Allied Telesis recommends PSU A because that slot does not
come with a blank power supply panel.
2. If there is already a power supply in PSU A, remove the blank panel
from PSU B slot by pressing the release tab to the right and sliding the
panel from the switch. Refer to Figure 40 on page 89.

Advertisement

Table of Contents
loading

Table of Contents