Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Allied Telesis Manuals
Switch
950 Series
Installation manual
Figure 29: Removing The Power Supply From The Shipping Box; Figure 30: Removing The Power Supply From The Shipping End-Caps And Protective Bag - Allied Telesis 950 Series Installation Manual
Advanced layer 3+ stand-alone switches
Hide thumbs
1
2
3
4
Table Of Contents
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
page
of
166
Go
/
166
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Advertisement
Figure 29. Removing the Power Supply from the Shipping Box
4. Remove the power supply from the shipping end-caps and protective
shipping bag. Refer to Figure 30.
Figure 30. Removing the Power Supply from the Shipping End-caps and
5. Visually inspect the product for damage.
6. After unpacking the switch and power supplies, go to Chapter 3,
"Installing Power Supplies and Optional XEM2 Line Card" on page 71.
x950 Series Installation Guide for Stand-alone Switches
Protective Bag
69
Table of
Contents
Previous
Page
Next
Page
1
...
66
67
68
69
70
71
72
73
Advertisement
Table of Contents
Related Manuals for Allied Telesis 950 Series
Switch Allied Telesis AT-x950-28XSQ Installation Manual
Virtual chassis stacking. advanced layer 3+ switch (190 pages)
Switch Allied Telesis AT 9924SP AT-9924SP-30 AT-9924SP-30 Software Manual
Configure epsr (ethernet protection switching ring) to protect a ring from loops (56 pages)
Switch Allied Telesis 9400 SERIES Datasheet
Managed gigabit ethernet switches with enhanced security and layer 2-4 intelligence (3 pages)
Switch Allied Telesis AT-9748TS/XP Brochure
Layer 3 advanced ipv4 and ipv6 gigabit switches / stackable gigabit ethernet switches / fast ethernet switches (6 pages)
Switch Allied Telesis AT-9900s Installation And Safety Manual
Allied telesis switch installation and safety guide (38 pages)
Switch Allied Telesis SB244-03 Specification
Allied telesis series switches data specification (8 pages)
Switch Allied Telesis AT-x510-28GTX Command Reference Manual
Stackable gigabit edge switches (2601 pages)
Switch Allied Telesis AT-8350GB Installation Manual
Fast ethernet switch (104 pages)
Switch Allied Telesis AT X900-12XT/S How To Configure
Alliedware plus os hardware filters (21 pages)
Switch Allied Telesis AT-FH812u User Manual
Fast ethernet 10/100 hub (32 pages)
Switch Allied Telesis x950-52XTQm Installation Manual
Standalone switches, advanced layer 3+ alliedware plus (230 pages)
Switch Allied Telesis AT-XS916MXT Installation Manual
Xs916mx series 10 gigabit ethernet switches (76 pages)
Switch Allied Telesis AT-FS750 User Manual
L2 managed switch - web gui manual (74 pages)
Switch Allied Telesis x600-24Ts Software Reference Manual
X600 series switches alliedware plus operating system software reference for version 5.3.1 (1808 pages)
Switch Allied Telesis AT-9000/28 Command Line User's Manual
Alliedware plus version 2.1.2 management software for layer 2-4 gigabit ethernet ecoswitches (1276 pages)
Switch Allied Telesis AT-x930-28GTX Command Reference Manual
Advanced gigabit layer 3 stackable switches (3082 pages)
Related Content for Allied Telesis 950 Series
x950 Series Figure 53: Removing The Power Supply From The Shipping Box
Allied Telesis x950 Series
x950 Series Figure 30: Removing The Power Supply From The Shipping Box
Allied Telesis x950 Series
AlliedWare Plus x950 Series Figure 46: Removing The Power Supply From The Shipping Box
Allied Telesis AlliedWare Plus x950 Series
AT-x950-28XSQ Figure 45: Removing The Power Supply From The Shipping Box
Allied Telesis AT-x950-28XSQ
SwitchBlade x908 GEN2 Figure 36: Items In The Shipping Box For The Sbxpwrsys2 Ac Power Supply
Allied Telesis SwitchBlade x908 GEN2
SwitchBlade x908 GEN2 Figure 22: Items In The Shipping Box For The Sbxpwrsys2 Ac Power Supply
Allied Telesis SwitchBlade x908 GEN2
AT-SBx908 Figure 29: Items In The Shipping Box For The At-Sbxpwrsys2 Ac Power Supply
Allied Telesis AT-SBx908
AT-SB*908 GEN2 Figure 29: Items In The Shipping Box For The At-Sbxpwrsys2 Ac Power Supply
Allied Telesis AT-SB*908 GEN2
AT-SBx908 Gen2 Figure 16: Items In The Shipping Box For The At-Sbxpwrsys2 Ac Power Supply
Allied Telesis AT-SBx908 Gen2
AT-DC2552XS Figure 18: Contents Of The At-Pwr06 Power Supply Module Shipping Box
Allied Telesis AT-DC2552XS
AT-DC2552XS Figure 12: Contents Of The At-Pwr06 Power Supply Module Shipping Box
Allied Telesis AT-DC2552XS
SwitchBlade x3112 Figure 49: Removing The Blank Slot Cover From Power Supply Slot C
Allied Telesis SwitchBlade x3112
SwitchBladex8112 Figure 154: Removing The Power Supply From The Chassis
Allied Telesis SwitchBladex8112
SwitchBlade x908 GEN2 Figure 120: Lifting The Locking Handle And Removing The Power Supply
Allied Telesis SwitchBlade x908 GEN2
AlliedWare Plus x530DP Series Removing The Pwr250-80 Dc Power Supply
Allied Telesis AlliedWare Plus x530DP Series
x530DP Series Figure 84: Removing A Power Supply
Allied Telesis x530DP Series
This manual is also suitable for:
At-x950-28xsq
At-x950-28xtqm
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL