Figure 166: Lifting The Locking Handle And Removing The Power Supply - Allied Telesis SwitchBlade x3106 Installation Manual

Table of Contents

Advertisement

SwitchBlade x3106 Chassis Switch and AT-SBx31CFC960 Card Installation Guide
Figure 166. Lifting the Locking Handle and Removing the Power Supply
12. Do one of the following:
To install a new power supply, refer to Chapter 6, "Installing the
Power Supplies" on page 105.
If you are not installing a new power supply, continue with this
procedure to install a blank slot cover.
13. Place the locking handle on the slot cover in the up position and slide
the cover into the empty power supply slot. Refer to Figure 167 on
page 264.