Chapter 7: Powering On the Switch

What to Do Next

96
Do one of the following:
If the switch has the PWR250-80 DC Power Supply, power on the
DC circuit and the On/Off switch on the power supply. If you have
not wired the DC connector yet, perform the procedure in Chapter
9, "Wiring the DC Connector on the PWR250-80 Power Supply" on
page 109.
To monitor the switch as it initializes the management software, go
to "Monitoring the Initialization Processes" on page 97.
Wait two minutes for the switch to initialize its management
software and then go to Chapter 8, "Configuring the Switch for
Standalone Operations" on page 101.