What to Do Next

After configuring the master switch, do the following:
1. Power off the switch by disconnecting its AC power cords from the AC
power sources. Refer to Figure 80 on page 153.
Figure 80. Powering Off the Switch
2. Configure the member switches, as explained in Chapter 9,
"Configuring Member Switches" on page 155.
3. After configuring the master and member switches, verify that all the
units are powered off.
4. Cable the ports of the stack trunk. Refer to Chapter 11, "Cabling the
Networking Ports" on page 171.
5. Power on the switches of the stack. Refer to "Powering on the Stack"
on page 168.
6. Verify that the switches formed the stack. Refer to "Verifying the Stack"
on page 169.
7. Cable the networking ports. Refer to Chapter 11, "Cabling the
Networking Ports" on page 171.
x950 Series Installation Guide for VCStack
153