Figure 39: Loosen Power/Alarm Connector Wire Retaining Screws; Figure 40: Insert Power Supply And Alarm Wires Into Power/Alarm Connector - Allied Telesis AT-IS230-10GP Installation Manual

Industrial ethernet layer 2 switches
Table of Contents

Advertisement

5. Loosen the wire retaining screws for each of the six wire connections
on the power/alarm connector with a #1 screwdriver as shown in
Figure 39.
Figure 39. Loosen Power/Alarm Connector Wire Retaining Screws
6. Insert the power wires into the wiring slots for V1+ and V1- for the first
power supply. If you are installing the wires for a second power supply,
insert them into wiring slots V2+ and v2-. Insert the two alarm wires in
the two middle wiring slots - pins 3 and 4. There is no polarity for the
alarm wires. Refer to Figure 40.
Figure 40. Insert Power Supply and Alarm Wires into Power/Alarm
7. After inserting the wires to the connector, verify that there are no
exposed wires or loose wire strands. Refer to Figure 41 on page 84.
IS Series Industrial Ethernet Layer 2 Switch Installation Guide
PWR V2+/-
PFail
PWR V1+/-
AT-IS230-10GP
PWR V1+/-
PFail
PWR V2+/-
AT-IS130-6GP
Connector
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is seriesAt-is130-6gpIs230-10gpIs130-6gp

Table of Contents