Mcm Microtim Operation; Pdt Operation; Front Panel Control Operation; Start, Warm-Up And On-Process Sequences - Edwards GXS Series Instruction Manual

Dry screw vacuum pump
Table of Contents

Advertisement

4.1.1 MCM MicroTIM operation

If the dry pumping system is to be operated by the user's control equipment by the
MCM MicroTIM, ensure that no other devices have control of the dry pumping system. If
another device has the control, it must be released before the pump can be started by
the MCM MicroTIM.
Use the control equipment to set the pump start/stop signal to the interface
connector and check that the running LEDs are illuminated.
The MCM MicroTIM takes control. The message 'MTIM IN CONTROL' will be
displayed on the PDT if connected. The green tool control LED on the rear panel
will illuminate. Refer to
(system with rear exhaust and castors/levelling feet

4.1.2 PDT operation

If the dry pumping system is to be operated using the PDT:
Connect the PDT to the required PDT connection.
Control must be taken with the PDT - press Control button. The message 'PDT1 IN
CONTROL' will be displayed if the front connection is used and the message 'PDT2
IN CONTROL' will be displayed if the rear connection is used.
Press START button. Refer to
information.
Press ENTER.
The dry pumping system will start and the running LED on the pump and the Pump
on LED on the PDT will flash while the pump is coming on and warming up. These
LEDs will stop flashing and remain illuminated continuously once the pump is
on‑process.

4.1.3 Front panel control operation

To operate the dry pumping system using the front panel controls (refer to
panel
controls):
Press and hold the local control button (item 5). The green local control LED (item
6) will illuminate continuously when control is taken. The message 'Keys in Control'
will be displayed on the PDT if connected.
Press and hold the start button (item 3) until the pump starts. The running LED
(item 2) and Green mode LED (item 10) will both flash while the pump is coming
on and warming up. Once the pump has warmed up and is ready for the process,
the running LED will remain illuminated continuously and the Green mode LED will
go off.

4.1.4 Start, warm-up and on-process sequences

The dry pumping systems are shipped with a number of pre‑programmed sequences.
Many of the parameters are configurable. The parameters can be configured using a PDT
M58800880_H - Operation
Figure: The controls/connectors on the rear of the pump
Front -
Figure: Front panel
Rear -
Figure: The controls/connectors on the rear of the pump (system with
rear exhaust and castors/levelling feet
controls, item 11
fitted), item 5
Pump display terminal
Page 55
fitted), item 9.
on page 120 for more
Figure: Front

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents