Leak Test The Dry Pumping System; Electrical Supply; Figure 6 Interspool Connections On The Pump/Booster Combination Systems - Edwards GXS Series Instruction Manual

Dry screw vacuum pump
Table of Contents

Advertisement

3.5 Leak test the dry pumping system

Figure 6 Interspool connections on the pump/booster combination systems

ID
1
2
3
4
WARNING:
Leak test the dry pumping system after installation and seal any leaks found to
prevent leakage of dangerous substances out of the dry pumping system and leakage
of air into the dry pumping system.
The pump and booster combination systems have an interspool which has several ports
that can be used for leak checking purposes. Remove the right hand side panel.
Note:
For further information on the leak testing, contact us or the supplier for advice.

3.6 Electrical supply

WARNING:
Ensure that the electrical installation of the dry pumping system conforms to all local,
regional and national safety requirements. It must be connected to a suitably fused
and protected electrical supply and a suitable earth (ground) point.
M58800880_H - Installation
Part identification
1/4 inch BSP inlet port (available on dry pumping systems with light duty gas
module only)
3/8 inch BSP port
Interspool
3/8 inch BSP port
Page 37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents