Nortel DMS-100 Series Maintenance Manual page 368

Subscriber carrier module-100s
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

9-4 Trouble isolation and correction
Accessing SysB alarms for the SMS
Message at SMS level
All C-side Links are Down
Audit Detected Inconsistent
PM Activity
Audit Detected Inconsistent
PM State
Autonomous Activity Drop
Diagnostics Failed
Inact Unit Lost Data Synch
PM Audit Detect Fault
PM SWACT
Require Data Load
Reset While INSV
297-8231-550 Standard 09.01 August 1998
Possible conditions
The central-side (C-side) peripheral
module (PM) cannot communicate
with the SMS.
The computing module (CM) detects
that unit 0 is active, but unit 1 is
inactive. This means that the CM has
not detected the occurrence of a
SWACT. The CM busies and
returns-to-service (RTS) both units.
The CM has the units return with the
active/inactive unit configuration of the
original CM.
The internal state of the active unit is
not ready. The state is busy, restart,
or synchronize. This condition
identifies a software error. The CM
BSYs and RTSs both the SMS and
the C-side links. The CM tries to
return the SMS and C-side links to
service.
A system-generated SWACT
occurred, normally because of a trap
or facility audit.
Unit failed test (TST) or RTS.
Unit-to-unit communication failed.
The system cannot perform a warm
SWACT.
One of the background hardware
audits detects a fault.
A warm SWACT occurred.
An error occurred on a DS-1 link to
the unit. The unit waits for a
maintenance system reset.
An error occurred on a DS-1 link to
the unit. The unit waits for a
maintenance system reset.
—continued—