Nortel DMS-100 Series Maintenance Manual page 190

Subscriber carrier module-100s
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

6-26 Alarm clearing procedures
PM SMS
minor
(continued)
11
12
13
297-8231-550 Standard 09.01 August 1998
Note: A maintenance flag (Mtce in the following example) appears when
maintenance tasks are in progress. Wait until the flag disappears before you
proceed with the next maintenance action.
Example of a MAP response:
SMS 0 ISTb
Links_OOS:
Unit0:
Act
ISTb
Unit1:
Inact InSv
If the message is
SwAct passed
SwAct failed
SwAct failed
Reason: XPM SwActback
SwAct refused by SwAct
controller
The inactive unit cannot establish two-way communication with the central
control (CC) and switches activity back to the original active unit. You must
clear all faults on the inactive unit before you attempt to clear the alarm
condition on the active unit.
Go to step 13.
The SWACT controller does not recommend a SWACT for the reason(s) stated.
You must clear all faults on the inactive unit before you attempt to clear the
alarm condition on the active unit.
Go to step 13.
To check for fault indicators on the inactive unit, type
>QUERYPM FLT
and press the Enter key.
CSide 0, PSide 0
Mtce
Mtce
Do
step 13
step 45
step 11
step 12

Advertisement

Table of Contents
loading

Table of Contents