Polaris RANGER 1000 2020 Service Manual page 265

Hide thumbs Also See for RANGER 1000 2020:
Table of Contents

Advertisement

REPLACEMENT ONLY
q
1. Remove the fastener
and nut
w
ignition coil
to the mounting bracket
2. Transfer the hardware to the new ignition coil before
reassembly. Torque the fastener to specification.
TORQUE
Ignition Coil Bracket Fastener:
7 ft-lbs (9 Nm)
INSTALLATION
r
1. Mounting the ignition coil
e
the two fasteners
. Torque to specification.
TORQUE
Ignition Coil Retaining Fastener:
6 ft-lbs (8 Nm)
9850045 R01 - 2020-2021 RANGER 1000 Service Manual
© Copyright Polaris Inc.
t
securing the
r
.
on the chassis and install
ENGINE ELECTRICAL
w
2. Install the connector
and ignition coil wires.
IMPORTANT
The spark plug wires are marked PTO and MAG and
should be installed in the corresponding ignition coil
post.
4
4.19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger 1000 2021

Table of Contents