Lnw74 And Lnw87 Testing - Alcatel-Lucent 1665 Installation Manual

Data multiplexer extend (dmxtend)
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Stand-alone installation testing
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
9
Repeat
........................................................................................................................................................................................................................
10
Check off the appropriate box in the
.
E
O
N D
........................................................................................................................................................

LNW74 and LNW87 testing

LNW74 (10/100) and LNW87 (FE/GBE PL) TX Ethernet cabling testing
This procedure is to test the Ethernet 10/100 TX cabling from function groups D and G to
the RJ45 patch panel for use with the LNW74 and LNW87.
Note:
VLF main packs (LNW141 or LNW84) and the LNW74 and LNW87 are provisioned
to be equipped in both function slots (D1 and D2 or G1 and G2). In this configuration
the backplane electrical ports cannot be used, only the SFP-based faceplate ports are
used.
The following cables are required to test the Ethernet cabling.
Cable
Front CIT(RS-232) Cable
(C848748869)
LAN 10BaseT Straight-through
Cable
Ethernet port assignment verification testing
........................................................................................................................................................................................................................
1
Connect the Front CIT cable between the PC and the CIT/RS 232 port of the System
Controller and login to the shelf using the serial connection and the GUI options on
WaveStar
........................................................................................................................................................................................................................
2
Identify the function groups that contain LNW74 or LNW87 circuit packs with cabling for
testing.
............................................................................................................................................................................................................................................................
6 - 2 2
Step 1
through
Step 8
S
F
T E P S
LNW74 TX Ethernet cabling test is not required. If the shelf is equipped with
®
CIT.
for each DS3 cabled to the DSX-3.
"Installation checklist" (p.
Length
8'-0"
As required to reach
from front of Alcatel-
Lucent 1665 DMXtend
to the RJ45 patch panel
II-5).
Quantity
1
2
Alcatel-Lucent 1665 DMXtend R10.0